All 11 punch-list tasks shipped (junctions, WinRT toast, DPR re-fit landed last) plus the foundational PTY-host / runtime-process work. Stop fix is the only deferred item, waiting on upstream PR #1496. Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| assets | ||
| design | ||
| specs | ||
| superpowers/plans | ||
| CLI.md | ||
| DEVELOPMENT.md | ||
| PLUGIN_SPEC.md | ||
| SECURITY-AUDIT-SUMMARY.md | ||
| design-cli-redesign-analysis.html | ||
| design-npm-global-install-fixes.html | ||
| design-onboarding-improvements.html | ||
| observability.md | ||
| openclaw-plugin-setup.md | ||
| opencode-workflows-spec.md | ||
| state-machine-stage2-evidence-recovery-plan.md | ||